Within 30 days after completion and Borough approval of subdivision
or land development improvements as shown on final plans, and before
Borough acceptance of such improvements, the developer shall submit
to the Borough Council a plan showing actual locations, dimensions
and conditions of streets and all other public improvements, including
easements, showing geometry and monument locations certified by a
registered engineer and/or a registered surveyor to be in accordance
with actual construction. As-built plans shall show elevations and
inverts to all manholes, pipes and roads, lateral connections to sewer
mains and water service connections to water service mains. The developer
must provide a hard copy and electronic copy of the plan.
Ord. 2016-2267, 10/11/2016
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');